Usage: | Biscuit, Cake, Pizza, Bread |
---|---|
Power Source: | Electric |
Timing Device: | With Timing Device |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Name | Model | Size | Temperature |
Tray Number (400*600mm) |
Power (kw) | Door | Weight (kg) | Humidity | Cooling Way |
Retarder Proofer | HDR-FRP18 |
600*925* 2155 |
-8ºCto+40ºC | 18 | 2.3 | single | 160 | 50%-99% | air-cooled |
HDR-FRP36 |
775*1200 *2150 |
-8ºCto+40ºC | 36 | 2.3 | 200 | ||||
HDR-FRP16+16 |
775*1130 *2150 |
+2ºCto+40ºC | 32 | 3 | two | 240 | |||
-8ºCto+40ºC |
More About Haidier Retarder Proofer
1. The compressor is Tecumseh , imported from Denmark, high efficiency, little vibration, low noise.
2. Both sides of insulation layer material are stainless steel, the thickness of 1.0 mm.Thermal insulation layer is high pressure PU inside, density, good thermal insulation.Using high pressure foaming machine manufacturing, can solve the problem of stainless steel plate and foaming PU shell, the service life of the body for more than 30 years
3. Use protective hair heat pipe, prolong the life of heating tube from 3 years to 10 years
4. The water filter and spray, broke through the tube, the atomization effect in the maximum.
5. At the bottom of the drainage, drainage from plane to flat slope drainage back now, make the none point water, clean health!
6. Control mode: the numerical control panel
7. CE and ISO9001 electronic accessories schneider
Our customer and team
FAQ:
Q1. What is your terms of packing?
A: Generally, we pack our goods in wooden packaging
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU,DDP.
Q4. How about your delivery time?
A: Generally, it will take 15 to 20 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings.
Q6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q7: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
Q8:How long about the warrenty ?
A: High end: 24 months
Low end: 14 months
Q9:How to contact us?
Send your Inquiry Details in the Below.Click "Send " Now!
Suppliers with verified business licenses